Construction compliance reports without the admin drag
BuilderPro helps engineers manage site drawings, loop details, evidence, issues and closeout reports from one place.
Closeout pack status
Site readyPlans linked
8
Evidence items
126
Open issues
7
Reports ready
3
Plan markup
Devices, loops and notes connected to drawings.
Report pack
Evidence and issues prepared for handover.
The problem
Site information should not disappear into admin.
BuilderPro is built around the practical work of engineers and compliance teams: drawings, visits, evidence, issues and reports.
Evidence gets scattered
Photos, notes, drawings and messages often sit in separate places, making handover harder than it needs to be.
Admin is duplicated
Engineers capture information on site, then repeat the same work later to create schedules, reports and closeout packs.
Closeout takes too long
Assembling clean evidence trails and issue histories can delay project completion and client sign-off.
Issues lose context
Remedials are easier to manage when they stay connected to the project, drawing, device, visit and evidence.
Workflow
From project setup to closeout pack.
A practical workflow for construction and compliance teams who need reliable records from site to handover.
Create project
Set the client, site, project status, panel details, milestones and team access.
Upload plans/drawings
Attach PDF, PNG or JPG plans and keep markups, devices and notes tied to the right file.
Capture visit evidence
Record site notes, photos, checks and device status during engineer visits.
Track issues/remedials
Manage open issues, severity, closeout impact and follow-up actions in one place.
Generate closeout report
Prepare clearer handover packs with evidence, schedules, annotated drawings and visit records.
Features
Everything connected to the project record.
BuilderPro turns drawings, site visits, evidence and closeout tasks into structured records your team can actually work from.
Mark up plans and drawings on site
Keep uploaded drawings connected to project notes, rooms, devices, loops and measurements.
Document loop and device details
Structure device schedules, loop capacity, labels, wiring context and room information for review.
Guide engineer visit workflows
Support active visits with plan access, device checks, checklists, issue capture and closeout steps.
Capture evidence during visits
Record photos, notes and compliance evidence against the right project, drawing, device or issue.
Track issues from discovery to closeout
Keep remedials, severity, status and closeout impact visible across the project lifecycle.
Generate cleaner handover packs
Prepare schedules, annotated drawings, visit reports, evidence records and closeout documentation.
Organise teams and projects
Manage project access, organisation settings and collaboration without exposing unrelated project data.
Use standards and reference support
Give engineers practical reference material for panels, calculations and standards-led review.
Who it is for
Built for people responsible for site evidence and closeout.
BuilderPro supports technical teams who need reliable project records without adding more disconnected spreadsheets and folders.
Trust and control
A technical product for real project records.
Built for UK site workflows
Practical project, visit, evidence and closeout workflows for engineering teams.
Structured audit trail
Keep issues, evidence, devices and reports connected from visit to handover.
Mobile-ready for site use
Support engineers capturing notes, photos, checks and issues while on site.
Professional judgement stays in control
Reference and AI-assisted features are designed to support review, not replace competent assessment.
Open beta
Want to test BuilderPro on a live project?
Use BuilderPro to keep drawings, evidence, issues and closeout reporting connected from the first visit to the final handover pack.
